Mechanical Installation

General Mounting Principles

  • Before starting the mechanical installation on a selected place, make sure carefully that the preparations associated with it (drilling, wall cutting) cannot damage the electrical, gas, water and other existing wires and pipes.

  • The warranty does not apply to the product defects and failures arisen as a result of improper installation (in contradiction herewith). The manufacturer is neither liable for damage caused by theft within an area that is accessible after the attached electric lock is switched on. The product is not designed as a burglar protection device except when used in combination with a standard lock, which has the security function.

  • When the proper installation instructions are not met, water might get in and destroy the electronics. As the device circuits are constantly under voltage water leakage causes electrochemical reaction. The manufacturer‘s warranty shall be void for products damaged in this way!

  • Make sure that the dowel holes have the required diameter. If the diameters are too large, the dowels may get loose! Use the mounting glue to secure the dowels if necessary.

  • Make sure that the depths of the dowel holes are accurate!

  • Do not use low-quality dowels to avoid their falling out of the wall!

  • Having removed the front panel, make sure that no dirt gets inside the product, especially onto the sealing surface.

  • Make sure that the plasterboard interior does not show a pressure value significantly different from that of the room, e.g. that it is not connected with overpressure ventilation. If the difference is too great, separate the device in terms of pressure (using, e.g., a mounting box) and seal the cable passage.

Can we advise you on anything else?

Take advantage of our technical support and sales specialists.